LOCATION: | Spartanburg, SC |
GMP’s SCOPE of SERVICES |
Project Management Construction Management Engineering Coordination Procurement Support Project Controls and Scheduling EHS Management |
PRODUCT: | USPS’s Next Generation Delivery Vehicle (NGDV) |
ENGAGEMENT: | 2021 – Present |
- Modification of a regional distribution center to be an assembly plant
- Engineering / design, procurement, fabrication, and construction for upgrading an existing facility to the construction and assembly of the NGDV
- Demolition of internal structures
- Assistance with permitting, as requested
- Outfit a body shop, paint shop, assembly lines, and materials distribution equipment.
- Key Strategic Objectives:
- Execute the work safely and protect the environment
- Meet the milestone project schedule dates
- Meet project performance guarantees
- Construction
- Commissioning & Start-up
- Turnover to Operations
Site Logistics:
- Site Area: 40-acre
- Floor Area: 1.0 MM sq. ft.

Oshkosh Defense, LLC